久久婷婷六月天婷婷,欧美日本日韩一区二区三区,黄色三级三级三级视频,国内精品丝袜福利视频

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁(yè) News Industry information

Insulation work of medical device shell

Release time:2023-03-30

Medical diagnosis, measurement and treatment equipment using AC power supply may cause leakage current due to improper grounding and electrical insulation, which may expose patients and even medical staff to the risk of electric shock, burns, internal organ damage and arrhythmia. So do a good jobMedical device shellInsulation work.

美容儀器殼9.jpg


1. The equipment shall be manufactured and sealed to prevent contact with live parts and parts that may be live in a single fault state. If the bulb can be replaced without tools, it must be ensured to prevent contact with the live parts of the lamp when loading and unloading the bulb.


2. The position or size of any hole on the top cover of the medical device shell shall ensure that the test rod with a diameter of 4 mm and a length of 100 mm will not touch live parts when it is freely and vertically suspended in the access hole throughout its length.


3. When the handle, knob, control lever, etc. are removed, the conductor part of the operating mechanism of the control device can be touched. When the open circuit test voltage is not greater than 50V AC and the test current is not less than 1a, the resistance measured to the protective grounding terminal should not be greater than 0.2 Ω; Or it should be isolated from live parts by adopting a method of 17g in GB 9706.1-2007.


4. If the components with line voltage above 25V AC or 60V DC in the shell of the medical device cannot be disconnected from the power supply through the external main switch or the plug device that can be pulled out at any time, additional covers shall be used for protection, so that contact can be prevented even after the shell is opened, or when the spaces are separated and arranged, the "live" mark shall be clearly marked.


5. In order to prevent contact with live parts, the shell must be removed only with tools, otherwise an automatic device should be used when opening or removing the shell, so that these parts are not used.


6. When the device has a preset controller, it can be adjusted by the user with tools during normal use. The hole opened for adjusting these control devices shall be designed so that the adjusting tool cannot contact the basic insulation or any live parts in the hole, or any parts isolated from the grid power supply part only through the basic insulation but without grounding protection.


Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
7m视频7m精品视频网站-亚洲综合香蕉视频在线| 中文字幕社区电影成人-欧美精美视频一区二区三区| 亚洲另类自拍唯美另类-99国产精品兔免久久| 国内精产熟女自线一二三区-六月丁香婷婷在线观看| 精品老熟妇一区二区三区-日韩丰满一区二区三区| 91蜜桃传媒一二三区-日韩欧美国产一区呦呦| 久久网址一区二区精品视频-日产国产欧美视频一区精品| 欧美日本亚一级二级三区久久精品-日韩欧美一区二区久久婷婷| 三上悠亚免费观看在线-青青草原在线视频观看精品| 天天干天天日天天射天天舔-精品香蕉视频官网在线观看| 亚洲另类熟女国产精品-懂色一区二区三区在线播放| 国产欧美日韩精品一区在线-久久精品视频免费获取地址| 精品少妇一区二区18-一区二区三区日韩在线播放| 久久久精品欧美日韩国产-欧美精品乱码视频在线| 久久高清超碰av热热久久-国产高清不卡免费视频| 欧美日韩国产综合新一区-国产综合av一区二区三区| 乱入一二三免费在线观看-久久精品亚洲精品国产色婷婷| 欧美日韩国产综合四区-爆操极品尤物熟妇14p| 在线观看中午中文乱码-2021国产一级在线观看| 男人的天堂久久精品激情-最新亚洲精品a国产播放| 久久亚州天堂一区二区-色噜噜色哟哟一区二区三区| 两性污污视频网站在线观看-亚洲欧美日韩激情一区| 亚洲欧美日韩国产一区二区三区-国产欧美日韩一区二区免费| 午夜日韩精品在线视频-亚洲网老鸭窝男人的天堂| 熟女熟妇伦51788-国产av在线播放一区二区三区| mm在线精品视频在线观看-欧美国产日韩在线一区二区三区| 十九禁止观看无码视频-亚洲国产激情福利专区| 亚洲黑人欧美一区二区三区-亚洲一区二区三区免费视频播放| 婷婷综合在线视频观看-亚洲一区二区三区香蕉| 黄色av网站在线免费观看-亚洲欧美精品偷拍tv| 中文字幕日韩精品不卡一区二区-成人av在线观看一区二区| 国产欧美日韩精品一区在线-久久精品视频免费获取地址| 99热在线精品免费6-av一区二区在线观看| 亚洲欧洲成视频免费观看-国产福利一区二区在线观看| 黄片一区二区三区在线看-偷拍一区二区在线观看| 两性污污视频网站在线观看-亚洲欧美日韩激情一区| 久久久精品欧美日韩国产-欧美精品乱码视频在线| 久久精品亚洲无中文东京热-日本妹子内谢视频一区| 色婷婷六月婷婷一区二区-91草草国产欧美在线观看| 91九色蝌蚪丝袜人妻-国产精品9999网站| 国产精品美女在线网址-久草免费福利在线观看视频|